06CV836 QUALITY MANAGEMENT SYSTEM IN CIVIL ENGINEERING syllabus for CV


Part A
Unit-1 Quality Management System - QMS 5 hours

Introduction – Evolution of Quality Management System, Element of Quality, Quality Management System, Concept of Process, Network of Process in an organization, ISO 9000 Family, Applying ISO 9000 in practice, Importance of ISO 9000, Benefits of ISO standards of society, Total Quality Management, Comparison of ISO 9000 and TQM – Quality related definitions – Leaders in Quality or Quality Gurus – Customer Orientation – Mahatma Gandhi.

Unit-2 Implementing ISO 9001-2000 Quality Management System 5 hours

ISO 9000 – Quality Management Principles, ISO 9000 Documents Content of ISO 9001 : 2000, ISO 9001-2000 Quality Management System Requirements, General Requirements, Documentation Requirements, Management Responsibilities, Resource Management, Product Realization, Measurement, analysis and Improvement Monitoring and Measurement, Non-conforming Product, Analysis of data, Improvement, Implementing ISO 9001-2000 Quality Management System.

Unit-3 Preparing A ISO 9001-200 Quality Management System for Civil Engineering 8 hours

Quality Manual, Introduction, Scope of the Quality Manual, Applicability, Responsibility, Quality Management System, General Requirements, Management Responsibilities, Management Commitment, Customer Focus, Indian Construction Company Quality Policy, Planning Responsibility, Authority and Communication, Management Review, Resource Management, Provision of Resources, Human Resources Product Realization, Planning or Product Realization, Customer Related Processes, Design and Development, Purchasing, Production and Service Provision, Control of Monitoring and Measuring Devices Measurement, analysis and Improvement, Monitoring and Measurement, Non-conforming product, Analysis of data, Improvement

Unit-4 Quality Management System Procedures 8 hours

Introduction, procedure for management review, Format for writing procedures, procedure for preparing Quality plans/ work instructions, Contract review, Design control, Document and data control, Document numbering system, Change request, procedure for purchasing, procedure for control of customer supplied product, procedure for product identification and traceability, procedure for process control, procedure for inspection and testing, procedure for control of inspection, measuring and test equipments, procedure for inspection and test status, procedure for the control of non-conforming product, procedure for corrective and preventive action, procedure for handling, storage, packaging and delivery, control of quality records, procedure for internal quality audits.

Part B
Unit-5 Work Instructions 5 hours

Introduction – Document and Data Control, Material Procurement, Material Handling, Tendering and Estimating, Planning, Design, Training, Plant and Equipment, Bar Bending Schedule, Concrete Works, Earthworks and Compaction, General Soil Investigation works, Survey works, Concrete Repair Works, Road Works, Painting Works, Water Proofing works, Drainage Works, Quality Assurance and Control, Patching and Transportation of Concrete.

Unit-6 Method Statement 5 hours

Introduction, Concrete Works, Earthworks and Compaction, General Soil Investigation works, Survey works, Concrete Repair works, Concrete Demolition works, Road Works, Fencing works etc.

Unit-7 Job Description 8 hours

1.Job Description: Introduction, Job Description of : Managing Director, Project Manager, Site Manager, Site Engineer, QA/QC Engineer, Foreman, Typist/Clerk, Design Engineer, Planning Engineer.2.Quality Control Plan/Inspection and Test Plans (ITPS): Introduction-Preparation of Project Quality Plans, Inspection and Test plant.

Unit-8 Quality Record/FORMATS 8 hours

Preparation of Standard Formats: Revision Control form, Document Distribution List, Document Master List, Non-Conformance Report, Store Issue/Receipt Voucher, Local Purchase Order, Material Stock Card, Audit Notification, Quality Audit Report, Corrective Action Report, Calibration Record, Calibration Master Sheet, Work Instruction, Job Description, Contract/Tender Review Form, Quantity Survey Estimation/Take off sheet, Material/Plant Requisition, Drawing Schedule, Bar-bending Schedule, Design Calculation Sheet, Request for Inspection, Concrete Inspection Request, Inspection Check List – Drainage, Painting, Request for Inspection-Concrete Repair, Accident Report Form, Concrete Production, Concrete Compressive Strength Test Results, Request to Conduct Cube Test, Quality Awareness Training Record.

Last Updated: Tuesday, January 24, 2023