a) Y Bus formation for power systems with and without mutual coupling, by singular transformation and inspection method. b) Determination of bus currents, bus power and line flow for a specified system voltage (Bus) Profile
Formation of Z-bus(without mutual coupling) using Z-bus building Algorithm .
ABCD parameters: Formation for symmetric π/T configuration. Verification of AD-BC=1 Determination of efficiency and regulation
Determination of power angle diagrams, reluctance power, excitation, emf and regulation for salient and non-salient pole synchronous machines,.
To obtain swing curve and to determine critical clearing time and regulation for a single machine connected to infinity bus through a pair of identical transmission lines under 3-phase fault on one of the lines for variation of inertia constant/line parameters /fault location/clearing time/pre-fault electrical output.
Formation of Jacobian for a system not exceeding 4 buses (no PV buses) in polar coordinates
Write a program to perform load using Gauss- Seidel method (only p q bus)
To determine fault currents and voltages in a single transmission line system with star-delta transformers at a specified location for LG, LLG.
Load flow analysis using Gauss Siedel method, NR method, Fast decoupled method for both pq and pv buses.
Optimal Generation Scheduling for Thermal power plants.